Advantages of having As-built 6D BIM models include capturing alterations from construction documents in an easily accessible manner, being a source for future building maintenance, procurement planning and providing a snapshot of existing design.
As-built (LOD 500)
As-built documents are vital to any project; Often, plans get generated only after the project is complete. As a result, many minor changes or deviations from Construction Documents go unnoticed or misinterpreted. Even worse, often as-built drawings are never created, leaving Construction Drawings the only source of documentation.
When engaged as a monitoring and progress auditing team, bimgrafX can provide accurate and complete as-built drawings with all the changes made on-site and not as per the design. Handling and keeping all construction-related information in one BIM model allows us unlimited flexibility for entering and changing even minute deviations from construction documents